Improvements Funded by Measure H

MULTI-PURPOSE ROOMS FOR:

Cirby
Crestmont
Kaseberg
Sargeant
Sierra Gardens
Cost of Multi-Purpose Rooms: $11,946,879

KASEBERG – EXISTING BUILDINGS

Asbestos Removal/Replace Vinyl Floor Tile
Dry-Rot and Termite Damage
Cabinetry/Casework Upgrades
Replace Doors/Hardware
Install Vinyl-Backed Tackboards
Replace Ceiling Tiles
Paint/Cleaning Exterior-Interior Walls
ADA Upgrades to Toilet Rooms
Replace Window Blinds
Upgrade Electrical Power
Upgrade Fire Alarm System
Upgrade Telephone System
Site Improvements
Asphalt overlays
Re-route domestic water
Office Upgrade
Replace Windows (20%)

Construct twelve (12) permanent classrooms to replace existing outdated portables

CIRBY – EXISTING BUILDINGS

Asbestos Removal/Replace Vinyl Floor Tile
Dry-Rot and Termite Damage
Cabinetry/Casework Upgrades
Roof Repairs
Replace Doors/Hardware
Install Vinyl-Backed Tackboards
Replace Ceiling Tiles
Paint/Cleaning Exterior-Interior Walls
ADA Upgrades to Toilet Rooms
Replace Window Blinds
Upgrade Electrical Power
Upgrade Fire Alarm System
Upgrade Telephone System

W. T. EICH – EXISTING FACILITIES

Gym HVAC
Field and Sprinkler Renovation

WOODBRIDGE – EXISTING BUILDINGS

Asbestos Removal/Replace Vinyl Floor Tile
Dry-Rot and Termite Damage
Cabinetry/Casework Upgrades
Replace Doors/Hardware
Install Vinyl-Backed Tackboards
Replace Ceiling Tiles
Paint/Cleaning Exterior-Interior Walls
Wheelchair Lift – Multi-Purpose Room
Renovate Existing Multi-Purpose Room
ADA Upgrades to Toilet Rooms
Replace Window Blinds
Upgrade Electrical Power
Upgrade Fire Alarm System
Upgrade Telephone System
Site Improvements
Asphalt Overlays

CRESTMONT – EXISTING BULDINGS

Asbestos Removal/Replace Vinyl Floor Tile
Dry-Rot and Termite Damage
Cabinetry/Casework Upgrades
Roof Repairs
Replace Doors/Hardware
Install Vinyl-Backed Tackboards
Replace Ceiling Tiles
Paint/Cleaning Exterior-Interior Walls
ADA Upgrades to Toilet Rooms
Replace Window Blinds
Upgrade Electrical Power
Upgrade Fire Alarm System
Upgrade Telephone System
ADA Site Ramps
Replace HVAC
Add Energy Management System
Office Upgrade

Cost of Renovations: $11,574,926

DISTRICT TECHNOLOGY UPGRADES

Wiring
Switches
Conduit

DISTRICT

District Facility
Technology Staff Development
District Administration
Cost: $2,948,260

TOTAL BOND AMOUNT: 29,117,071*

(*Includes contingency funds of $2,647,006 for inflationary/construction bidding factors)